Skip to content
Nicolas Repond
The Bulle swimming pool construction site seen from the air, winter 2020
The Bulle swimming pool construction site seen from the air, winter 2020.

Transformation in progress

I look forward to presenting the website to you once it is finished

Aerial view of a lone swimmer in the main pool of the Bulle municipal swimming pool
Bulle municipal swimming pool, 2021.

Nicolas Repond, photographer in Vuadens

Construction and architecture, aerial views, alpine pasture, business and portrait.

I

The Bulle swimming pool

2020 – 2021 · Town of Bulle View the story
The demolition of the old pool, summer 2020.
The demolition of the old pool, summer 2020.
The diving platform, once the pool was refilled.
The diving platform, once the pool was refilled.
The construction site seen from the air, winter 2020.
The construction site seen from the air, winter 2020.
II

À l'alpage

Ongoing · Gruyère AOP View the story
On the plain of the Gros-Mont.
On the plain of the Gros-Mont.
At the Petzernetz chalet.
At the Petzernetz chalet.

Journal

The stories, arranged by theme.